More Output. Less Risk. Better Compliance. For Electrical Contractors on Major Projects.
Electrical contractors on large projects face constant pressure on productivity, installation quality, and compliance documentation. Cable pulling is one of the most physically demanding and risk-prone activities on site. Corelay transforms it — making your team faster, safer, and audit-ready from the first pull.
What You're Responsible For
Smart cable pulling is designed around the delivery pressures that matter to electrical contractors — programme certainty, installation quality, safety performance, and the compliance documentation you need at handover.
- Cable installation productivity and programme performance
- Labour deployment and operatives management
- Installation quality and rework avoidance
- BS 7671 compliance and O&M documentation
- Health and safety on cable installation operations
Where This Applies
Corelay is deployed across major UK projects in the following sectors:
Built Around What Matters to Electrical Contractors
Productivity gain of up to 40%
Faster cable pulls, less manual effort, and consistent output means your team gets through more volume in the same programme time.
Significant reduction in manual handling
The system carries the pulling load. Your operatives guide and manage the cable — dramatically reducing physical strain and associated injury risk.
Elimination of cable damage risk
Conventional winch tension can damage sheaths on longer or more complex routes. Distributed drive keeps tension controlled at every point — eliminating rework.
Built-in compliance documentation
Every pull is automatically logged — tension, speed, duration, timestamp. Exportable as PDF or CSV directly into your O&M and handover package.
Flexible and site-ready
28 kg, fits through standard door openings, site-ready in under 15 minutes. Moves between zones and floors as your programme demands.
What Changes When You Use Corelay
- More cable installation volume per operative per shift
- Reduced MSK injury risk on extended pull operations
- No cable damage claims or rework delays on complex routes
- Compliant pull records built into your O&M submission
The Technology Behind It
What Backs This Up
Corelay is NICEIC-approved, NSI Silver and BAFE accredited, TrustMark registered and Safe PQQ certified, carrying £10M public liability insurance and a 12-month written workmanship guarantee on every installation — the assurance package electrical contractors need for supply chain due diligence and PQQ requirements.
Questions From Electrical Contractors
Can Corelay subcontract the cable pull while I retain the client relationship?
Yes — this is the standard arrangement for electrical contractors. Corelay delivers the automated pull on a subcontract basis while you maintain the client relationship and contract. White-label arrangements mean Corelay operates under your company name: documentation, certification and correspondence are produced in your name. Call 0117 463 2988 to discuss.
Will Corelay's certification meet my client's requirements?
Yes. Corelay is NICEIC-approved and all installations are certified to BS 7671. Full EICRs, installation certificates and test documentation are provided on every project — formatted for your client handover pack, building control, or sector compliance framework. A 12-month written workmanship guarantee is included on all work.
Get in Touch
Find Out How Corelay Fits Your Projects
If you are managing a large cable installation programme and need faster output with better compliance, talk to us about how our system integrates with your site operations.